26th Day
by
Georgios Toubekis
—
last modified
Jul 23, 2007 03:16 PM
Our scaffold engineer arrived today. His task will be to continue the scaffold construction so that future repair works can be executed without the need for hanging climbers from the top of the figure.
The following days will be dominated from the work on the steel pipe construction. The work is very dangerous as the fragile backside should not be touched in any case in order to prevent loose and shallow parts to fall down.

